patio Installation process
Step 1: Clearing site area

Site or area for paving must be cleared and levelled. Topsoil removed and disposed
Site or area for paving must be cleared and levelled. Topsoil removed and disposed
Diggers and Dumpers allow this process to be executed quickly.
Step 2: installing patio base
Step 3: levelling
Area must be levelled to allow three to four inches below finished surface area. This includes stone mortar bed and 804 limestone hardcore base
Step 4: Edging and Paving
The area then need to be marked out and led lighting armored cables laid out.
The edging pavers give a clear definition to boundary of paving and allow for a secure and solid retention of
paving. Grouting with rompox or fudge grouting compound then fills spaces between flagstones.
This leaves the flagstones with a uniform surface that gives a smooth run off for water and drainage.
Step 5: Grouting and pointing
Step 6: Sealing
Sealing the patio with Dry Treat sealant guarentees that the patio will remain as perfect as the day it was laid for a lifetime.